[1]
Trissiyana, T., Setiawan, E. and Putra, R.A. 2017. Waktu Efektif Pelaksanaan Pekerjaan Pembangunan Jaringan Reklamasi Rawa di Kotawaringin Barat. Media Ilmiah Teknik Lingkungan (MITL). 2, 1 (Feb. 2017), 6–11. DOI:https://doi.org/10.33084/mitl.v2i1.127.