CRISH, C.; RESPATI, R.; SAPUTRA, N. A. Analisa Produktivitas Tenaga Kerja Pada Proyek Pembangunan Gedung Bertingkat Dengan Menggunakan Metode Time Study (Studi Kasus: Proyek Pembangunan Gedung Kejaksaan Tinggi Kalimantan Tengah): Analysis Of Labor Productivity In Multi-Story Building Construction Projects Using Time Study Method (Case Study: Construction Project Of The High Prosecutor’s Office In Central Kalimantan). Media Ilmiah Teknik Sipil, [S. l.], v. 12, n. 1, p. 77–86, 2024. DOI: 10.33084/mits.v12i1.5781. Disponível em: https://journal.umpr.ac.id/index.php/mits/article/view/5781. Acesso em: 4 dec. 2024.