Pelatihan Mesin Industri Pakan Ikan Berbasis PLTS 2 WP di Desa Selika 2 Kecamatan Tanjung Kemuning Kabupaten Kaur

PLTS 2 WP Based Fish Feed Industry Machine Training in Selika 2 Village, Tanjung Kemuning District, Kaur Regency

Authors

DOI:

https://doi.org/10.33084/pengabdianmu.v8i3.4278

Keywords:

PLTS, Fish Feed, Feed Industry Machinery

Abstract

Selika 2 Village, Tanjung Kemuning District, Kaur Regency is located in Bengkulu Province in the south, where many fish farming industries have been built in Selika 2 Village due to the high unemployment rate. Many fish farming industries were built to reduce the unemployment rate in Selika 2 Village. However, the obstacle of the fish farming industry is the high price of fish feed, and the small fish feed industry needs help to afford it, so the price of fish being sold is high, and eventually, many industries are closed. Even though the Natural Resources (SDA) owned in Selika 2 Village are numerous, for example, corn, cassava, rice, and golden snails, widely cultivated in the rice fields. This natural resource can be utilized and processed into high-protein fish feed. So for that, our Kosabangsa service team donated several fish feed industry machines with a PLTS power source of 2 MWP, the method of this service is a team of experts providing training on running feed industry machines. The aim of this dedication is that in the future, in Selika Village, a fish feed industry can be built where the price of fish feed can be below the market price of Rp. 5,000,-/kg.

Downloads

Download data is not yet available.

References

Bulkaini, Mastur, Ashari, Sumadi IK, & Bidura IGNG. (2021). Inovasi Teknologi Pembuatan Pakan Ayam Broiler Berbasis Bahan Baku Lokal. Jurnal Pengabdian Magister Pendidikan IPA, 4(4), 123-127. https://doi.org/10.29303/jpmpi.v4i4.1071

Chamdareno, P. G. & Hilal, H. (2018). Analisa Pembangkit Listrik Tenaga Hybrid PLTD-PLTS di Pulau Tunda Serang Banten. Resistor (Elektronika Kendali Telekomunikasi Tenaga Listrik Komputer), 1(1), 350-42. https://doi.org/10.24853/resistor.1.1.35-42

Farid, M., Widodo, E., & Natsir, M. H. (2019). Identifikasi Pengaruh Maksimal Level Bekatul Terhadap Penampilan Produksi Ayam Petelur. Jurnal Nutrisi Ternak Tropis, 2(2), 59-64. https://doi.org/10.21776/ub.jnt.2019.002.02.5

Juen, B. B., Suriana, I. W., Sukadana, I. W., & Yasa, I. W. S. (2020). Perancangan Sistem Pembangkit Listrik Tenaga Hybrid Antara PLN dan PLTS. Jurnal Ilmiah Telsinas Elektro, Sipil, dan Teknik Informasi, 3(2), 41–51.

Nugraha, I. M. A., Desnanjaya, I. G. M. N., Serihollo, L. G. G., & Siregar, J. S. M. (2020). Perancangan Hybrid System PLTS dan Generator Sebagai Catu Daya Tambahan Pada Tambak Udang Vaname: Studi Kasus Politeknik Keluatan Dan Perikanan Kupang. Majalah Ilmiah Teknologi Elektro, 19(1), 121-125. https://doi.org/10.24843/mite.2020.v19i01.p18

Nuryanto, L. E. (2021). Perancangan Sistem Kontrol Pembangkit Listrik Tenaga Hybrid (PLN dan PLTS) Kapasitas 800 Wp. Orbith : Majalah Ilmiah Pengembangan Rekayasa dan Sosial, 17(3), 196–205. http://dx.doi.org/10.32497/orbith.v17i3.3443

Putra, A. A. G. A. P., Kumara, I. N. S., & Ariastina, W. G. (2020). Review Perkembangan PLTS di Provinsi Bali Menuju Target Kapasitas 108 MW Tahun 2025. Majalah Ilmiah Teknologi Elektro, 19(2), 181-188. https://doi.org/10.24843/mite.2020.v19i02.p09

Ridwan, Ramadhan, W., Kurniawan, A., Lestari, W., & Setiawan, D. (2021). Pemanfaatan Sinar Matahari Sebagai Energi Alternatif Untuk Kebutuhan Energi Listrik. Seminar Nasional Karya Ilmiah Multidisiplin, 1(1), 168–176.

Riyanto, S., & Pangestu, I. A. (2021). Perancangan Instalasi Listrik Hybrid Menggunakan Sumber Jaringan Listrik PLN dan Pembangkit Listrik Tenaga Surya Pada Bangunan Gedung Sekolah SMPN 7 Kota Tarakan. Jurnal INOVTEK Seri Elektro, 3(3), 105–115. https://doi.org/10.35314/ise.v3i3.2179

Simanjuntak, I. U. V. & Artanto, A. (2022). Analisa Anti Islanding Pada Inverter 3 Fase PLTS Hybrid 5 Kw Terhadap Jaringan PLN. Cyclotron: Jurnal Teknik Elektro, 5(2), 7-13. http://dx.doi.org/10.30651/cl.v5i2.12520

Sukoco, A., Setiawan, M. I., Mudjanarko, S. W., Nasihien, R. D., Suyono, J., Sudapet, I. N., et al. (2018). Alat Pembuat Pakan Ikan Dengan Sumber Listrik Tenaga Surya (Solar Powered Fish Feeding Machine), Mendukung Peningkatan Pendapatan UMKM Dan Produksi Pakan Ikan Daerah. Janaka : Jurnal Pengabdian Masyarakat, 1(1), 15-29.

Downloads

Published

2023-05-31

How to Cite

Amri, K., Handayani, Y. S., Hestiawan, H., & Hardiansyah, H. (2023). Pelatihan Mesin Industri Pakan Ikan Berbasis PLTS 2 WP di Desa Selika 2 Kecamatan Tanjung Kemuning Kabupaten Kaur: PLTS 2 WP Based Fish Feed Industry Machine Training in Selika 2 Village, Tanjung Kemuning District, Kaur Regency. PengabdianMu: Jurnal Ilmiah Pengabdian Kepada Masyarakat, 8(3), 355–363. https://doi.org/10.33084/pengabdianmu.v8i3.4278