(1)
Noor, R.; Husna, Y. A. Pengawasan Rencana Keselamatan Konstruksi Menggunakan Metode Hazard Dan Risk Control Pada Pemancangan Jembatan Sebulu Tahap 1: Supervision of Construction Safety Plans Using Hazard and Risk Control Methods in the Erection of the Sebulu Bridge Phase 1. Pengabdianmu J Ilmiah Pengabdian Masyarakat 2025, 10, 2041-2049.