[1]
R. Noor and Y. A. Husna, “Pengawasan Rencana Keselamatan Konstruksi Menggunakan Metode Hazard dan Risk Control pada Pemancangan Jembatan Sebulu Tahap 1: Supervision of Construction Safety Plans Using Hazard and Risk Control Methods in the Erection of the Sebulu Bridge Phase 1”, Pengabdianmu J Ilmiah Pengabdian Masyarakat, vol. 10, no. 9, pp. 2041–2049, Sept. 2025, doi: 10.33084/pengabdianmu.v10i9.8923.