1.
Noor R, Husna YA. Pengawasan Rencana Keselamatan Konstruksi Menggunakan Metode Hazard dan Risk Control pada Pemancangan Jembatan Sebulu Tahap 1: Supervision of Construction Safety Plans Using Hazard and Risk Control Methods in the Erection of the Sebulu Bridge Phase 1. Pengabdianmu J Ilmiah Pengabdian Masyarakat [Internet]. 2025Sep.30 [cited 2025Dec.5];10(9):2041-9. Available from: https://journal.umpr.ac.id/index.php/pengabdianmu/article/view/8923