Analisis Penggantian Material Agregat Klas A Dan B Menjadi CTRB Paket Peningkatan Jalan Muara Teweh – Benangin Menggunakan Metode AASTHO’93

Material Replacement Analysis Class A And B Aggregates Become A CTRB Of Road Improvement Package Muara Teweh – Benangin Using The AASTHO’93 Method

Authors

  • Nasib A. Sera Balai Pelaksanaan Jalan Nasional Palangka Raya

DOI:

https://doi.org/10.33084/mits.v9i1.1736

Keywords:

AASTHO’93, Klas A Klas B, CTRB

Abstract

Roads are one of the infrastructures that will accelerate the growth and development of an area and open up socio-economic and cultural relations between regions. Along with the progress of infrastructure, the government has developed transportation facilities, namely the improvement of the Muara Teweh - Benangin road. In the Law of the Republic of Indonesia No.38 of 2004 concerning road infrastructure, roads have an important role in realizing the development of the nation's life. The improvement of the Muara Teweh - Benangin road used the flexible pavement thickness planning with the AASTHO 1993 method, the planned road life for flexible pavement was 20 years and the traffic growth factor was 6%. Sources of data used to plan flexible pavements were obtained from the Ministry of Public Works, Directorate General of Highways - National Executive Office VII. The data derived from the documentation is CBR data of subgrade and average traffic (LHR). These data are the basis most needed in planning a flexible pavement using the AASTHO method 1993. Based on the results of the calculation of the flexible pavement thickness planning using the AASTHO method, the following comparisons are obtained: (a) the total thickness of the surface layer HRS-Base / ATB 6 cm + HRS WC 3 cm, the upper foundation layer of class A = 15 cm, and the lower foundation layer of class B = 20 cm at a cost of Rp. 35,742,463,681, with an implementation time of 265 calendar days. (b) total surface layer thickness of HRS-Base / ATB 6 cm + HRS WC 3 cm, foundation layer CTRB 35 cm, at a cost of Rp. 34,278,182,220, - with execution time of 250 calendar days, resulting in a cost efficiency of Rp. 1,464,281,462, - with a difference of 15 calendar days

Downloads

Download data is not yet available.

Author Biography

Nasib A. Sera, Balai Pelaksanaan Jalan Nasional Palangka Raya

Aparatur Sipil Negara, Balai Pelaksanaan Jalan Nasional Palangka Raya, Direktorat Jenderal Bina Marga Kementerian Pekerjaan Umum dan Perumahan Rakyat

References

AASHTO. (1993). Guide For Design Of Pavement Structures. Washington
Anastasia H. Muda, (2009). Penelitian tersebut berjudul: Tinjauan Kuat Tekan Bebas dan Drying Shrinkage Cement Treated Recycling Base (CTRB) pada Rehabilitasi Jalan Boyolali-Kartasura. 2009.
Badan Pusat Statistik Kabupaten Barito Utara, (2015), Barito Utara Dalam Angka 2015.
Koestalam, P., Sutoyo. (2010), Perencanaan Tebal Perkerasan Jalan Jenis Lentur dan Jenis Kaku (sesuai AASTHO, 1986 & 1993). PT. Mediatama Saptakarya, Jakarta
Karsikun, dkk., (2008), Di ruas jalan Boyolali-Kartosuro dilaksanakan rehabilitasi jalan sepanjang 6.95 km dengan teknologi recycling in situ metode Cement Treated Recycling Base (CTRB).
PUSLITBANG Jalan Jembatan, (2002), Penelitian Daur Ulang Lapis Perkerasan Beton Aspal dengan Bahan Tambahan Semen, Bandung
PUSLITBANG Jalan Jembatan, (2003), Lanjutan Penelitian Daur Ulang Lapis Perkerasan Beton Aspal dengan Bahan Tambahan Semen, Bandung.
PUSLITBANG Jalan Jembatan, (2006), Lanjutan Penelitian Daur Ulang Lapis Perkerasan Beton Aspal dengan Bahan Tambahan Semen, Bandung.
Sukirman, S. (1999), Perkerasan Lentur Jalan Raya. Nova, Bandung
Taha, dkk., (2002), Penelitian recycling lapis perkerasan lama dengan memanfaatkan Reclaimed Asphalt Pavement (RAP) berupa agregat alam yang distabilisasi Cement By-pass Dust sebagai lapisan perkerasan jalan

Downloads

Published

2020-12-01

How to Cite

Sera, N. A. (2020). Analisis Penggantian Material Agregat Klas A Dan B Menjadi CTRB Paket Peningkatan Jalan Muara Teweh – Benangin Menggunakan Metode AASTHO’93: Material Replacement Analysis Class A And B Aggregates Become A CTRB Of Road Improvement Package Muara Teweh – Benangin Using The AASTHO’93 Method. Media Ilmiah Teknik Sipil, 9(1), 24–31. https://doi.org/10.33084/mits.v9i1.1736