Evaluasi Pelaksanaan Proyek Drainase Dengan Metode CPM Dan PERT

Drainage Project Implementation Evaluation With The CPM And PERT Method

Authors

  • Gunaedy Utomo Universitas Balikpapan
  • Irna Hendriyani Universitas Balikpapan
  • Siti Nor Aida Universitas Balikpapan

DOI:

https://doi.org/10.33084/mits.v9i1.1884

Keywords:

CPM, PERT, Durasi Proyek, Jalur kritis

Abstract

This research purposes to evaluate the implementation of the drainage project in Jl. Mulawarman, Gg. Arjuna, Sepinggan. This research uses the CPM (Critical Path Method) and the PERT (Project Evaluation and Review Technique). Based on the budget plan, time schedule, weekly report, documentation and interview found that the result of the CPM with two critical paths are work activities. The first critical path are: Activity A (Mobilization and Demobilization), Activity C (Landfilling activity), Activity F (Concrete works K-175, Ready Mix). The second critical path are: Activity A (Mobilization and Demobilization), Activity E (Begisting work for black channels), and Activity G (Plain U24 Concrete Iron Works). Meanwhile, the result of PERT has 49% chance to be completed with the project duration of 18 weeks.

Downloads

Download data is not yet available.

Author Biographies

Downloads

Published

2020-12-01

How to Cite

Utomo, G., Hendriyani, I., & Aida, S. N. (2020). Evaluasi Pelaksanaan Proyek Drainase Dengan Metode CPM Dan PERT: Drainage Project Implementation Evaluation With The CPM And PERT Method. Media Ilmiah Teknik Sipil, 9(1), 44-52. https://doi.org/10.33084/mits.v9i1.1884

Similar Articles

21-22 of 22

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)