Analisis Geometri Jalan Tambang Batubara Pada Kegiatan Overburden Removal di PT Satria Alam Manunggal Site TOP Desa Buhut Jaya Kabupaten Kapuas Provinsi Kalimantan Tengah Analysis Of Mine Road Geometry In Overburden Removal Activities At PT Satria Alam Manunggal Site TOP Buhut Jaya Village Kapuas Regency Central Kalimantan Province

Main Article Content

Anisa
Deddy Nan Setya Putra Tanggara
Dody Ariyantho Kusma Wijaya
Noveriady
Asri Fridtriyanda

Abstract

This study was conducted at PT Satria Alam Manunggal Site TOP to analyze the effect of road geometry conditions on the performance of Scania P410-B6x4 transport equipment in overburden material transportation activities. The haul route from the front to the disposal site is 2.4 km long, with an average hauler productivity of 33 BCM/hour, while the company's target is set at 40 BCM/hour. This situation indicates an issue with the hauler's travel time when transporting overburden material from the front to the disposal site, resulting in the hauler's productivity not being achieved. The analysis was conducted by dividing the haul road into 29 segments, consisting of 27 straight segments and 7 curved segments. The minimum width of straight roads is 9.1 meters for two lanes and 5.2 meters for one lane, while for curves, the minimum width is 16.29 meters and 9.31 meters, with a maximum road gradient (grade) of 8%, as well as other elements such as curve radius, superelevation, cross slope, safety berm, and drainage channels, also affect operational comfort and safety. The objective of this study is to evaluate and provide recommendations for road geometry improvements to meet technical standards, thereby reducing travel time and increasing transportation vehicle productivity.

Downloads

Download data is not yet available.

Article Details

How to Cite
Anisa, Tanggara, D. N. S. P., Wijaya, D. A. K., Noveriady, & Fridtriyanda, A. (2026). Analisis Geometri Jalan Tambang Batubara Pada Kegiatan Overburden Removal di PT Satria Alam Manunggal Site TOP Desa Buhut Jaya Kabupaten Kapuas Provinsi Kalimantan Tengah: Analysis Of Mine Road Geometry In Overburden Removal Activities At PT Satria Alam Manunggal Site TOP Buhut Jaya Village Kapuas Regency Central Kalimantan Province. Media Ilmiah Teknik Sipil, 14(1), 310–324. Retrieved from https://journal.umpr.ac.id/index.php/mits/article/view/10767
Section
Articles

References

Achida, M., Rizky Awaliah Nafiu Program Studi Teknik Pertambangan, W., Ilmu Dan Teknologi Kebumian, F., & Halu Oleo Kampus Bumi Hijau Tri Dharma Anduonohu, U. (2021). Evaluasi Dan Redesign Geometri Jalan Angkut Tambang Dari Pit Alaska Menuju Stockpile Pada Pt. Bumi Nikel Nusantara Kabupaten Konawe Utara. In Jurnal Riset Teknologi Pertambangan (J-Ristam (Vol. 1, Issue 2).

Ahmad. (2018). Anamoli Kewenangan: Studi Pengaturan Jalan Umum Dalam Kegiatan Usaha Pertambangan Mineral Dan Batubara Di Sumatera Selatan. Jurnal Hukum Replik.

Budi Listyawan, A., Nur Sahid, M., Slamet Mulyono, G., & Khairurizal Fadhlullah, H. (2021). Analysis Of Heavy Equipment Productivity And Costs Of Earthwork In The Project Of Pondok Aren Hospital South Tangerang.

Cahyadi, R., Ade Isnaeni, K. M., Harpiandi, D., Program, ), Pertambangan, S. T., Politeknik, B., Palembang, A., & Corresponding Author, I. (2022). Optimalisasi Produktivitas Alat Gali Muat Terhadap Pengupasan Overburden Di Pt Xyz The Optimization Of Digging-Loading Equipment On The Overburden Removal At Pt Xyz (Vol. 13).

Dede Yusup. (2022). Kajian Teknis Geometri Jalan Angkut Tambang Pada Kegiatan Pengupasan Overburden Pt. Bara Prima Pratama Kabupaten Indragiri Hilir Provinsi Riau.

Gusman, S., Studi Teknik Pertambangan Batubara Politeknik Akamigas Palembang, P., & Corresponding Author, I. (2021). The Evaluation Of Overburden Ripping Production To Achieve The Production Target Of 190.000 Bcm In March 2021 At Pit Crm Pt Duta Alam Sumatera, Lahat, South Sumatra (Vol. 12).

Hadi Zulkarnain Ladianto. (2019). Evaluasi Produktivitas Alat Muat Dan Alat Angkut Untuk Memenuhi Target Produksi Bulanan Pengupasan Overburdenpada Penambangan Nikel Di Blok B Pt. Paramitha Persada Tama Provinsi Sulawesi Tenggara.

Halawa Analiser. (2021). Analisa Geometri Jalan Angkut Guna Meningkatkan Cycletime Dan Produktivitas Alat Angkut Pada Kegiatan Pengupasan Overburden Dari Front Pengupasan Ke Disposal Area Pada Kegiatan Penambangan Batubara. Jurnal Sains Dan Teknologi Istp, 16, 1–16.

Jalan, J., Jembatan, D., Litbang, P., & Dan Jembatan, J. (2009). Pengkinian Manual Kapasitas Jalan Indonesia 1997 Erwin Kusnandar (Vol. 26, Issue 2).

Jawad, A. A., Mulyono, A., & Zulziar, M. (2022). Proses Alignment Mesin Uji Rolling Resistance Menggunakan Ban Referensi Dengan Metode Regresi Linier Sederhana Pada Lab X Dalam Pemenuhan Regulasi Iso 28580. In Jitmi (Vol. 5).

Keputusan-Menteri-Esdm-Nomor-1827-K-30-Mem-2018. (2018).

Muhammad Dwi Nanda, Yuliadi, & Zaenal. (2021). Kajian Geometri Jalan Tambang Berdasarkan Aashto Dan Kepmen No 1827/K/30/Mem/2018 Pada Penambangan Andesit Di Pt Xyz, Kecamatan Rumpin, Kabupaten Bogor, Provinsi Jawa Barat. Jurnal Riset Teknik Pertambangan, 1(2), 107–116. Https://Doi.Org/10.29313/Jrtp.V1i2.403

Peraturan Menteri Esdm Nomoe 26. (2018). Peraturan Menteri Esdm Nomor 26 Tahun 2018.

Peraturan Pemerintah Republik Indonesia. (N.D.).

Poalahi Salu, S., Syafar, M., & Rahman Rustan, F. (2024). Stabilita || Jurnal Ilmiah Teknik Sipil Evaluasi Geometri Jalan Angkut Dari Front Penambangan Menuju Stockpile Terhadap Pencapaian Target Produksi Pada Pt. St Nickel Resources Kabupaten Konawe, Provinsi Sulawesi Tenggara.

Suwandhi, A. (2004). Perencanaan Jalan Tambang.

Vina Nicke Suri. (2020). Kajian Teknis Geometri Jalan Angkut Dari Front Menuju Stockpile Di Pt Seluma Prima Coal Kabupaten Sarolangun Provinsi Jambi.

Warman, N., Hasan, H., Winarno, A., Trides, T., & Devy, S. D. (N.D.). Studi Pengaruh Geometri Jalan Akses Terhadap Produktivitas Alat Angkut Dalam Mencapai Target Produksi Overburden Pada Pt Energi Cahaya Industritama (The Study Of The Effect Of The Geometry Of The Access Road On The Productivity Of The Conveyance In Achieving The Overburden Production Target At Pt Energi Cahaya Industritama). In Jurnal Teknologi Mineral Ft Unmul (Vol. 10, Issue 1).

Waruwu, M., Natijatulpùat, S., Utami, P. R., Yanti, E., & Rusydiana, M. (2025). Metode Penelitian Kuantitatif: Konsep, Jenis, Tahapan Dan Kelebihan. Jurnal Ilmiah Profesi Pendidikan, 10(1), 917–932. Https://Doi.Org/10.29303/Jipp.V10i1.3057

Wildan Basuki. (2020). Perhitungan Kebutuhan Unit Dump Truckberdasarkanmatch Factor Dan Teori Antrian Pada Penambangan Batubara Di Pt. Kamalindo Sompurna Kecamatan Pelawan Kabupaten Sarolangun Provinsi Jambi.