Upaya Kontribusi melalui Keterlibatan Pengabdian Mahasiswa dalam Proses Konstruksi Pondasi Bored Piled Jembatan Timbang

Contribution of Student Community Service Involvement in the Bored Piled Weigh Bridge Foundation Construction Process

Authors

  • Ryan Zulfikar Universitas Muhammadiyah Kalimantan Timur
  • Rusandi Noor Universitas Muhammadiyah Kalimantan Timur https://orcid.org/0000-0001-5145-5759
  • Muhammad Irkham Firdaus PT. Ganda Alam Makmur

DOI:

https://doi.org/10.33084/pengabdianmu.v9i3.6053

Keywords:

Bored piled foundation, Weighing-bridge, Field study coal mining

Abstract

This activity is a community service carried out by UMKT Civil Engineering students who are integrated with UMKT Civil Engineering Lecturers for two months. The collaboration carried out by students with industry partners in the weighing-bridge construction project showed an essential contribution to the integration of actual and theory. The focus of this community service activity is the implementation of work methods on bored pile foundation work. Student activities include direct observation, interviews, and comparative theory analysis with field practice. The activity results focus on Standard Penetration Test (SPT) soil testing data, determining weighing-bridge bored pile points, and implementation methods. Through this activity, students and lecturers play an active role in providing accurate contributions to industrial partners in ensuring the efficiency and quality of the implementation of bored pile foundations. Thus, this activity not only provides solutions to problems faced by industrial partners but also serves as a direct learning medium for students. This emphasizes the importance of an interdisciplinary approach that combines science, technology, practical expertise, and academic theory in planning bored pile foundations for weighbridges.

Downloads

Download data is not yet available.

References

Aulia, A.,, & Sudraja, H. (2019). Analisis Daya Dukung Pondasi Bored Pile Dengan Hasil Uji Pembebanan Langsung (Loading Test). Seminar Nasional Teknik Sipil, 430.

Baskoro, M. A. (2018). Perencanaan Pondasi Bored Pile Jembatan Kali Keruh Kecamatan Sirampong Brebes. University Islam Sultan Agung.

Ervianto. (2005). Unsur-Unsur Pelaksanaan Proyek Konstruksi. Journal Of Chemical Information And Modeling, 53(9), 6-7.

Fitri, A. A. (2018). Perencanaan Ulang Struktur Bawah Abutmen Dengan Pondasi Bored Pile (Redesign Bottom Structure Abutment With Bored Pile Foundation). University Islam Indonesia.

Hansen, S. (2015). Manajemen Kontrak Konstruksi. Gramedia Pustaka Utama.

I Kadek Wirastrawan, I Budiadi, & I Putra. (2022). Analisis Manajemen Alat Berat Terhadap Pekerjaan Pondasi Bored Pile Pada Proyek Penggantian Jembatan Bindu. Politeknik Negeri Bali.

I Wayan Jawat, Putu Panji Tresna Gita, & I Made Satria Dharmayoga. (2020). Kajian Metoda Pelaksanaan Pekerjaan Pondasi Bored Pile Pada Tahap Perencanaan Pelaksanaan. PADURAKSA: . https://doi.org/10.22225/pd.9.2.1830.126-142

Jeko, P. (2022). Laporan Praktik Kerja Nyata Pelaksanaan Konstruksi Bored Interchange Karanganom Sta 12+973 Proyek Jalan Tol Solo-Yogyakarta-Nyia Kulon Progo. Universitas Tunas Pembangunan.

Liliana Putri, Nikolas Paulus, & Nmy Lewaherilla. (2021). Perencanaan Pondasi Jembatan Wai Hina Dengan Menggunakan Pondasi Bored Pile . Mamumata: Jurnal Ilmu Teknik 7 (1), 15-25.

Manorek, D. (2018). Pelaksanaan Pondasi Jembatan Tembran P2 Dengan Metode Bored Pile. Repository.Polindo.Ac.Id.

Muhammad Wahyudin, Amril Ma'ruf Siregar, & Lusemilia Afriani. (2019). Analisi Dan Perencanaan Pondasi Tiang Bored Pile Pada Jembatan Jalur Ganda Kereta Api Bekri Kabupaten Lampung Tengah. Journal Rekayasa Sipil dan Desain (JRSDD). 7(3) 495-504.

N.R. Adinda, & Ilham Nurhidayat. (2017). Analisis Pengaruh Penyebab Keterlambatan Proyek Terhadap Biaya Overhead. Jurnal Isu Teknologi. 12(1 ). 30-37.

Sari, Y. P. (2022). Studi Pengendalian dan Pengawasan Proyek Pada Pekerjaan Pondasi Bored Pile, Paket Penggantian Jembatan Besuk Kobo'an Lumajang, Jawa Timur . Politeknik Pekerjaan Umum.

Simbolon, B. F. (2021). Evaluasi Perencanaan Pondasi Bored Pile Dan Abutmen Pada Pembangunan Jembatan Baru Sei Wampu (Myc). Jurnal Ilmiah Teknik Sipil 10 (1), 151-160.

Stephen Hutan Siswanto, & Hendri Wijaya. (2009). Analisa Produktivitas Pembuatan Bored Pile Jembatan Suramadu Daerah Main Bridge . Petra Christian University.

Suma'mur. (1981). Keselamatan dan Kesehatan Kerja.

Wahyudiono, H, & Anam, S. 2018. Perencanaan Pondasi Bored Pile Pada Proyek Jembatan Ngujang Ii Kab. Tulungagung 22. https://doi.org/10.30737/ukarst.v2i1.356

Yuliana, C. (2013). Analisis Faktor Penyebab Terjadinya Keterlambatan Pada Pelaksanaan Proyek Pembangunan Jembatan . Info-Teknik 14(2) 144-125. http://dx.doi.org/10.20527/infotek.v14i2.297

Zonello G Jasso, Sutyanto Intan, & N Lewaherilla. (2018). Tinjauan Perencanaan Pondasi Jembatan Wai Aleo Di Ruas Jalan Sp Waipia-Liang Dengan Menggunakan Pondasi Bored Pile. Manumata: Jurnal Ilmu Teknik 4(2), https://doi.org/10.51135/manumatav4i2p47-55

Downloads

Published

2024-03-15

How to Cite

Zulfikar, R., Noor, R., & Firdaus, M. I. (2024). Upaya Kontribusi melalui Keterlibatan Pengabdian Mahasiswa dalam Proses Konstruksi Pondasi Bored Piled Jembatan Timbang: Contribution of Student Community Service Involvement in the Bored Piled Weigh Bridge Foundation Construction Process. PengabdianMu: Jurnal Ilmiah Pengabdian Kepada Masyarakat, 9(3), 414–422. https://doi.org/10.33084/pengabdianmu.v9i3.6053