Upaya Kontribusi melalui Keterlibatan Pengabdian Mahasiswa dalam Proses Konstruksi Pondasi Bored Piled Jembatan Timbang
Contribution of Student Community Service Involvement in the Bored Piled Weigh Bridge Foundation Construction Process
DOI:
https://doi.org/10.33084/pengabdianmu.v9i3.6053Keywords:
Bored piled foundation, Weighing-bridge, Field study coal miningAbstract
This activity is a community service carried out by UMKT Civil Engineering students who are integrated with UMKT Civil Engineering Lecturers for two months. The collaboration carried out by students with industry partners in the weighing-bridge construction project showed an essential contribution to the integration of actual and theory. The focus of this community service activity is the implementation of work methods on bored pile foundation work. Student activities include direct observation, interviews, and comparative theory analysis with field practice. The activity results focus on Standard Penetration Test (SPT) soil testing data, determining weighing-bridge bored pile points, and implementation methods. Through this activity, students and lecturers play an active role in providing accurate contributions to industrial partners in ensuring the efficiency and quality of the implementation of bored pile foundations. Thus, this activity not only provides solutions to problems faced by industrial partners but also serves as a direct learning medium for students. This emphasizes the importance of an interdisciplinary approach that combines science, technology, practical expertise, and academic theory in planning bored pile foundations for weighbridges.
Downloads
References
Aulia, A.,, & Sudraja, H. (2019). Analisis Daya Dukung Pondasi Bored Pile Dengan Hasil Uji Pembebanan Langsung (Loading Test). Seminar Nasional Teknik Sipil, 430.
Baskoro, M. A. (2018). Perencanaan Pondasi Bored Pile Jembatan Kali Keruh Kecamatan Sirampong Brebes. University Islam Sultan Agung.
Ervianto. (2005). Unsur-Unsur Pelaksanaan Proyek Konstruksi. Journal Of Chemical Information And Modeling, 53(9), 6-7.
Fitri, A. A. (2018). Perencanaan Ulang Struktur Bawah Abutmen Dengan Pondasi Bored Pile (Redesign Bottom Structure Abutment With Bored Pile Foundation). University Islam Indonesia.
Hansen, S. (2015). Manajemen Kontrak Konstruksi. Gramedia Pustaka Utama.
I Kadek Wirastrawan, I Budiadi, & I Putra. (2022). Analisis Manajemen Alat Berat Terhadap Pekerjaan Pondasi Bored Pile Pada Proyek Penggantian Jembatan Bindu. Politeknik Negeri Bali.
I Wayan Jawat, Putu Panji Tresna Gita, & I Made Satria Dharmayoga. (2020). Kajian Metoda Pelaksanaan Pekerjaan Pondasi Bored Pile Pada Tahap Perencanaan Pelaksanaan. PADURAKSA: . https://doi.org/10.22225/pd.9.2.1830.126-142
Jeko, P. (2022). Laporan Praktik Kerja Nyata Pelaksanaan Konstruksi Bored Interchange Karanganom Sta 12+973 Proyek Jalan Tol Solo-Yogyakarta-Nyia Kulon Progo. Universitas Tunas Pembangunan.
Liliana Putri, Nikolas Paulus, & Nmy Lewaherilla. (2021). Perencanaan Pondasi Jembatan Wai Hina Dengan Menggunakan Pondasi Bored Pile . Mamumata: Jurnal Ilmu Teknik 7 (1), 15-25.
Manorek, D. (2018). Pelaksanaan Pondasi Jembatan Tembran P2 Dengan Metode Bored Pile. Repository.Polindo.Ac.Id.
Muhammad Wahyudin, Amril Ma'ruf Siregar, & Lusemilia Afriani. (2019). Analisi Dan Perencanaan Pondasi Tiang Bored Pile Pada Jembatan Jalur Ganda Kereta Api Bekri Kabupaten Lampung Tengah. Journal Rekayasa Sipil dan Desain (JRSDD). 7(3) 495-504.
N.R. Adinda, & Ilham Nurhidayat. (2017). Analisis Pengaruh Penyebab Keterlambatan Proyek Terhadap Biaya Overhead. Jurnal Isu Teknologi. 12(1 ). 30-37.
Sari, Y. P. (2022). Studi Pengendalian dan Pengawasan Proyek Pada Pekerjaan Pondasi Bored Pile, Paket Penggantian Jembatan Besuk Kobo'an Lumajang, Jawa Timur . Politeknik Pekerjaan Umum.
Simbolon, B. F. (2021). Evaluasi Perencanaan Pondasi Bored Pile Dan Abutmen Pada Pembangunan Jembatan Baru Sei Wampu (Myc). Jurnal Ilmiah Teknik Sipil 10 (1), 151-160.
Stephen Hutan Siswanto, & Hendri Wijaya. (2009). Analisa Produktivitas Pembuatan Bored Pile Jembatan Suramadu Daerah Main Bridge . Petra Christian University.
Suma'mur. (1981). Keselamatan dan Kesehatan Kerja.
Wahyudiono, H, & Anam, S. 2018. Perencanaan Pondasi Bored Pile Pada Proyek Jembatan Ngujang Ii Kab. Tulungagung 22. https://doi.org/10.30737/ukarst.v2i1.356
Yuliana, C. (2013). Analisis Faktor Penyebab Terjadinya Keterlambatan Pada Pelaksanaan Proyek Pembangunan Jembatan . Info-Teknik 14(2) 144-125. http://dx.doi.org/10.20527/infotek.v14i2.297
Zonello G Jasso, Sutyanto Intan, & N Lewaherilla. (2018). Tinjauan Perencanaan Pondasi Jembatan Wai Aleo Di Ruas Jalan Sp Waipia-Liang Dengan Menggunakan Pondasi Bored Pile. Manumata: Jurnal Ilmu Teknik 4(2), https://doi.org/10.51135/manumatav4i2p47-55
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Ryan Zulfikar, Rusandi Noor, Muhammad Irkham Firdaus
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Any article on the copyright is retained by the author(s).
- Author grant the journal, right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share work with acknowledgment of the work authors and initial publications in this journal.
- Authors are able to enter into a separate, additional contractual arrangements for non-exclusive distribution of published articles of work (eg, post-institutional repository) or publish it in a book, with acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their websites) prior to and during the submission process, as can lead to productive exchanges, as well as earlier and greater citation of published work.
- The article and any associated published material is distributed under the Creative Commons Attribution-ShareAlike 4.0 International License