Upaya Pengawasan pada Metode Pelaksanaan Shotcrete dan Rockbolt pada Konstruksi Terowongan

Supervision Efforts on Shotcrete and Rockbolt Implementation Methods in Tunnel Construction

Authors

DOI:

https://doi.org/10.33084/pengabdianmu.v10i6.8899

Keywords:

Shotcrete, Rockbolt, Tunnel

Abstract

The Samarinda Tunnel construction project is a strategic effort to support infrastructure development in East Kalimantan. This tunnel is located from Jalan Sultan Alimuddin, Sambutan District to Jalan Kakap, Samarinda Ilir District, with a length of 690 meters from the entrance (Inlet) to the exit (Outlet). This tunnel is expected to be able to reduce traffic jams that often occur on Jalan Otto Iskandar Dinata, Sungai Dama Village. This project is owned by the Samarinda City Government (PUPR) and is implemented by the contractor PT. PP Persero with PT. Ciria Jasa Cipta Mandiri is the supervising consultant. The construction method used is the New Austrian Tunneling Method (NATM), with a focus on the use of shotcrete and rockbolt to maintain the stability of the tunnel structure during and after the construction process. Shotcrete provides temporary protection against ground pressure, while rockbolt strengthens the rock mass around the tunnel. In this community service, observations were carried out using a participatory method, where observers were directly involved in the activities being observed. This approach allows for a deeper understanding of the application of shotcrete and rockbolts, as well as the effectiveness of the supervision carried out to ensure compliance with applicable technical specifications and standards.

Downloads

References

Alamsyah, R. (2019). TA: Analisis Stabilitas Dan Deformasi Terowongan Kereta Cepat Indonesia Dengan Pendekatan Numerik Tiga Dimensi (Doctoral dissertation, Institut Teknologi Nasional).

Cahyadiawan, M. R. S. (2021). TA: Analisis Perbandingan Deformasi Metode Galian NATM Dengan Model Plaxis 3D Dan 2D Terowongan Kereta Cepat Jakarta-Bandung (Doctoral dissertation, Institut Teknologi Nasional).

Koesnaryo, S., Vera, T. V., Arindry, A. P. P., & Cholid, M. (2022). Tinjauan Aspek Kerekayasaan Pada Rancangan Terowongan Untuk Sipil dan Tambang. Jurnal Teknologi Pertambangan, 8(1), 48-55.

Moon, S. H., Shin, Y. W., Kim, S. H., & Yoo, H. K. (2012). A study on load bearing capacity of composite member with steel rib and shotcrete in NATM tunnel. KSCE Journal of Civil and Environmental Engineering Research, 32(5C), 221-229.

Sujarweni, V. W. (2014). Metodelogi penelitian. Yogyakarta: Pustaka Baru Perss.

Sulandari, N., Pranata, Y. A., & Kristianto, A. (2023). Studi Analitis dan Eksperimental Mekanisme Slip-Kritis Sambungan Struktural Baut Baja. Jurnal Teknik Sipil, 19(1), 158-173.

Syahlendra H, R. (2019). Proyek Pembangunan Apartemen Tamansari Cendekia Jalan Durian Raya No. 77 Semarang (Konsentrasi Struktur Bawah).

Van Gobel, F. M. (2019). Nilai kuat tekan beton pada slump beton tertentu. Radial, 5(1), 22-33.

Wibowo, C. (2020). Metode Pelaksanaan Pekerjaan Pembuatan Terowongan Pengelak Menggunakan New Austrian Tunneling Method (NATM) Di Proyek Bendungan Sidan Kabupaten Badung Provinsi Bali (Doctoral

Downloads

Published

2025-06-15

How to Cite

Noor, R., Saputra, F., Maulida, I., Zulkarnain, I., & Pamungkas, P. P. (2025). Upaya Pengawasan pada Metode Pelaksanaan Shotcrete dan Rockbolt pada Konstruksi Terowongan: Supervision Efforts on Shotcrete and Rockbolt Implementation Methods in Tunnel Construction. PengabdianMu: Jurnal Ilmiah Pengabdian Kepada Masyarakat, 10(6), 1460–1467. https://doi.org/10.33084/pengabdianmu.v10i6.8899