Pengawasan Rencana Keselamatan Konstruksi Menggunakan Metode Hazard dan Risk Control pada Pemancangan Jembatan Sebulu Tahap 1 Supervision of Construction Safety Plans Using Hazard and Risk Control Methods in the Erection of the Sebulu Bridge Phase 1

Main Article Content

Rusandi Noor
Yusrika Asmaul Husna

Abstract

The Sebulu Bridge Construction Project in Kutai Kartanegara Regency, East Kalimantan, aims to enhance interregional connectivity and facilitate the mobility of people and logistics distribution. This community service activity has two main objectives: to understand the methods of implementing Occupational Health and Safety (OHS) in the construction project, and to identify potential hazards that may cause work accidents through a hazard identification approach. The methods used in this activity include direct field observation, interviews with project implementers, and hazard analysis based on the types of work performed. The results indicate that the highest risks originate from working at heights, operating heavy equipment, and exposure to hazardous materials. OHS implementation measures include using personal protective equipment (PPE), periodic safety training, and intensive supervision at the project site. The discussion reveals that while the implementation of OHS has been relatively effective, there are still challenges related to worker discipline and limited supervisory resources. Therefore, increased supervision, stricter enforcement of OHS regulations, and regular evaluations are required to improve the effectiveness of safety systems on site.

Downloads

Download data is not yet available.

Article Details

How to Cite
Noor, R., & Husna, Y. A. (2025). Pengawasan Rencana Keselamatan Konstruksi Menggunakan Metode Hazard dan Risk Control pada Pemancangan Jembatan Sebulu Tahap 1: Supervision of Construction Safety Plans Using Hazard and Risk Control Methods in the Erection of the Sebulu Bridge Phase 1. PengabdianMu: Jurnal Ilmiah Pengabdian Kepada Masyarakat, 10(9), 2041–2049. https://doi.org/10.33084/pengabdianmu.v10i9.8923
Section
Articles

References

Lapis, J. O., Balamba, S., Sompie, O. B., & Sarajar, A. N. (2013). Analisis Kestabilan Pondasi Jembatan Studi Kasus: Jembatan Essang-Lalue. Jurnal Sipil Statik, 1(11). https://ejournal.unsrat.ac.id/v2/index.php/jss/article/view/3804

Bole, G. A. (2019). Studi Kasus Pelaksanaan K3 (Kesehatan dan Keselamatan Kerja) Konstruksi Jembatan di Sumba (Doctoral dissertation, Universitas Narotama Surabaya). http://repository.narotama.ac.id/579/

Messah, Y. A., Widodo, T., & Adoe, M. L. (2013). Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstuksi Gedung Di Kota Kupang. Jurnal Teknik Sipil, 2(2), 157-168. https://doi.org/10.35508/jts.2.2.157-168

Suwinardi, S. (2014). Organisasi Proyek. Orbith: Majalah Ilmiah Pengembangan Rekayasa dan Sosial, 10(1). https://jurnal.syntaxliterate.co.id/index.php/syntax-literate/article/view/12705/7962

Dannyanti, E. (2010). Optimalisasi pelaksanaan proyek dengan metode PERT dan CPM. Semarang. Universitas Diponegoro. https://eprints.undip.ac.id/26423/2/OPTIMALISASI_PELAKSANAAN_PROYEK_DENGAN_METODE_PERT_DAN_CPM-JURNAL.pdf

Fahmi, D. N., Anwar, S., & Rozy, N. (2017). Analisis Manajemen Konstruksi Proyek Jembatan Pakubeureum Kecamatan Kadipaten Kabupaten Majalengka. Jurnal Konstruksi dan Infrastruktur, 6(6). https://doi.org/10.33603/jki.v6i6.3875

Jawat, W. (2016). Metode Pelaksanaan Pekerjaan Tiang Pancang Sistem Hidraulic Jack In (Studi: Proyek KCU BCA Sunset Road Bali). PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 5(1), 43-52. https://doi.org/10.22225/pd.5.1.243.43-52

Sinaga, R. E. (2021). Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Rumah Susun Lanjutan Provinsi Sumatera Utara I Medan. https://ejournal.uhn.ac.id/index.php/construct/article/view/406/494